Revision history of "When Is An SBEM Calculation Required"

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

  • curprev 13:15, 26 April 2023SteffenStabile talk contribs 5,669 bytes +5,669 Created page with "<br>The EPC is the formalised certificate that permits the building to be offered or let. To avoid confusion, and duplicating costs, the EPC must be produced by the identical assessor who undertook the preliminary calculations. Do SBEM calculations involve a site visit? No, an SBEM calculation might be purely a desk based exercise. What particulars are required to run SBEM calculations? Full scaled plans, sections and elevations of the ultimate or intended layout, togeth..."